megapolis posts
2022-02-17 Update
Hello everyone,I'm stopping in to apologize for the lack of updates. The new year was tough on me, and there have been some personal events that have happened. About 12 of the 15 pages are colored at this time. I'll provide another update in 2 weeks if all goes well.Also, I'll be shuttin...
2021-11-17 Update
2 of 15 pages are colored. Please do not expect any updates until AFTER the Thanksgiving holiday.
2021-10-31 Update
All 15 pages are inked. Digital coloring has started. Next chapter's script is complete. Thumbnailing stage will begin shortly.(I will likely be shutting down this Patreon page once I start posting the pages. Thank you for your support and patience.)
2021-10-17 Update
13 of 15 pages are inked. 14th page is in process of being inked.
2021-10-09 Update
12 of 15 pages are inked. 13th page is in process of being inked.
2021-10-04 Update
11 of 15 pages are inked. 12th page is in process of being inked.
2021-09-26 Update
10 of 15 pages are inked.
2021-09-19 Update
My apologies for the late update. 9 of 15 pages are inked. A panel needed to be re-inked.
2021-09-11 Update
8 of 15 pages are inked. Scripting for the next chapter has progressed to 8 of 11 pages.
2021-09-05 Update
7 of 15 pages are inked. Updates will be made every Saturday night, now.
2021-09-02 Update
6 of 15 pages are inked. Another update will be available between Saturday night (09-04) and Sunday evening (09-05).
2021-08-25 Update
4 of 15 pages are inked. Scripting for next chapter has started.
2021-08-18 Update
15th page has been sketched and corrected. Mechanical details and sketch phase is complete. Inking has started.I repeat, INKING HAS STARTED.
2021-08-11 Update
Red line stage of all 14 pages is implemented. Background details have been sketched in. Mechanical details for 8 pages remain. 15th page sketch stage has started.To clarify, there are some mechanical sketches that need to be tightened up. 15th page is just a single image that needs to complete its ...
2021-08-04 Update
Red line stage of all 14 pages is complete. Implementation of redlined corrections and additional details has started. Additional 15th page has a completed thumbnail, photo reference is being gathered.
2021-07-28 Update
Blue line sketch phase is complete. Started making corrections. Additional 15th page is in production and will be completed beside the corrections.
2021-07-21 Update
Page 14 of 14 (a 2 page spread) has begun blue line sketching. Contemplating adding a 15th page (a single image/panel for the whole page, to not add any major additional work).
2021-07-14 Update
Page 12 of 14 has begun blue-line sketching. Making preparations for corrections and details stage.
2021-07-08 Update
Page 10 of 14 has begun blue-line sketching. New art supplies acquired to expedite correction stage and inking stage.
2021-06-30 Update
Page 9 of 14 has begun blue-line sketching. Following pages will hopefully be quicker to complete.
2021-06-23 Update
Page 8 of 14 has begun blue-line sketching. New printer has been installed and tested. (It's incredible.) New equipment for sketching and inking has arrived.
2021-06-16 Update
Page 6 of 14 has begun blue-line sketching. New printer has arrived and is going to be installed and tested. New equipment for sketching and inking has been purchased.
2021-06-09 Update
Page 5 of 14 has begun blue-line sketching. A new printer has been acquired and will assist with hastening production.(Sorry for the late update. Was having trouble accessing my Patreon. This post was supposed to be made over an hour ago. The issue is resolved, now.)
2021-06-02 Update
Page 4 of 14 has begun blue-line sketching. Expecting to catch up this weekend. Will post another update next wednesday.
2021-05-29 Update
3 of 14 pages have been blue-line sketched. I am now fully vaccinated. Due to other personal obligations, There has been a slight slowdown this week. Another update will be available on Wednesday.
21-05-21 Update
All thumbnails have been transferred to full size bristol paper sheets. Blue-line sketching stage has begun. Pages 2 of 14 is blue-line sketched.
2021-05-12 Update
Pages 1-10 have been transferred to bristol paper sheets. 4 pages remain. After transfer, the blue-line tight sketching stage begins.
2021-05-07 Update
Thumbnails printed out, beginning transfer process to full 11x17 inch bristol paper sheets. Pages 1-4 are transferred and ready for blue-line sketching. New webcam acquired and set up for streaming as I work.
2021-04-28 Update
Thumbnail sketches are completed. Corrections are completed. Tightening up process is completed. Will get the thumbnails ready for printing this weekend and begin blue-line sketching next week.
2021-04-21 Update
Thumbnail compiling complete. Corrections notated and in the process of being corrected. Minor details to be tightened up. Completion date of thumbnail sketches is still set for 2021-04-25. Afterwords, final sketching process will begin.Small note: I'm glad that I took that extra week. It has do...